Westshore Campus Phase II
Cuyahoga Community College
Facts
Site Size: 14.75 Acres
Client/Owner: Cuyahoga Community College
Lead Architect: Moody Nolan
Site Site: Westlake, OH
Moody Engineering Project Manager: Richard Keener
![0I3A3519 lo res.jpg](https://images.squarespace-cdn.com/content/v1/55ca08f9e4b0d196f15712be/1686078850374-FYDRY7ZIPD8LG0B0HSWD/0I3A3519+lo+res.jpg)
![DJI_0062 lo res.jpg](https://images.squarespace-cdn.com/content/v1/55ca08f9e4b0d196f15712be/1686078400508-D4XP8UFWDYEF8S84WW2Q/DJI_0062+lo+res.jpg)
![DJI_0157 lo res.jpg](https://images.squarespace-cdn.com/content/v1/55ca08f9e4b0d196f15712be/1686078839653-43TSV2BHOQKGTEDF9FZ5/DJI_0157+lo+res.jpg)
![DJI_0367 lo res.jpg](https://images.squarespace-cdn.com/content/v1/55ca08f9e4b0d196f15712be/1686078844452-GZ0EFP2XBXZKITLKYSHQ/DJI_0367+lo+res.jpg)
![DJI_0417 lo res.jpg](https://images.squarespace-cdn.com/content/v1/55ca08f9e4b0d196f15712be/1686078847940-9WVF0WF9M4320UNZFXWY/DJI_0417+lo+res.jpg)
Description
The Phase II expansion of the Westshore Campus of Cuyahoga Community College (Tri-C) consists of an approximately 86,000 square foot new 3-story building connecting to the existing building and renovation of the existing building. The construction budget was approximately $26,000,000 and construction was completed in 2019. The sitework included the preparation of construction documents for site pavements including an entrance drive and a parking area for approximately 432 spaces, access walks, including layout and grading, as well as a truck dock ramp for the new building, utility services including sanitary, storm, and a fire line extension. Stormwater control measures and a Storm Water Pollution Prevention Plan (SWP3) were also included.
One of the obstacles encountered on the project was an encroachment across a Conservation Easement that had to be made to be connected the storm system to the public storm sewer. This involved submitting a restoration plan and additional Conservation Easement area for approval to the US Army Corp. of Engineers. The site roadways were designed to accommodate a future RTA bus service to campus, including a bus drop-off pad.