Facts
Site Size: 1002 acre site
Client/Owner: Columbus Regional Airport Authority Lead Engineer: RS&H
Site Location: Columbus, OH
Moody Engineering Project Manager: Mark Larrimer
Description
Moody Engineering performed drainage design for the Runway Rehabilitation and Modification of Standards (MoS) Improvements Phase 2A Project at Rickenbacker International Airport (LCK). This included records research and field investigation to establish the extents of the existing drainage system. Additionally, new underdrain was designed to be installed with the rehabilitation of the runway shoulders. Moody Engineering reviewed the proposed vs. existing impervious areas to insure compliance with post construction run-off rates and EPA permit compliance.
Unique Factors
• The project was performed on an aggressive schedule in order to meet the airports operational needs