Fire Station #132

Mifflin Township

Facts
Site Size: 0.87 acres
Lead Architect: Moody Nolan
Site Location: Mifflin Township, OH
Moody Engineering Project Manager: Mark Larrimer

Description
Moody Engineering provided civil engineering services for a new fire station built on the former Mifflin Park, by demolishing the existing fire station next to the park and building a new fire station equal in size on the park site. The civil scope included a preliminary site compliance plan and site visit to assess existing conditions, preparing construction documents including the demolition plan, site layout and materials plan, and site and utilities details. In regards to site permitting documents, Moody Engineering provided CC-Storm Plans for drainage and erosion control, as well as a storm drainage report, and water and sanitary service plan.

The overall disturbance of this project required an OEPA Notice of Intent (NOI) and post construction water treatment. Due to the limited area on site and in order to meet City of Columbus stormwater requirements, an underground detention system was needed.